Cast Iron Rail Shoulder for E Clip Fastening System

Product Details
Customization: Available
After-sales Service: Free After Service
Warranty: 1 Year
Still deciding? Get samples of US$ 300/Piece
Request Sample
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (11)
  • Cast Iron Rail Shoulder for E Clip Fastening System
  • Cast Iron Rail Shoulder for E Clip Fastening System
  • Cast Iron Rail Shoulder for E Clip Fastening System
  • Cast Iron Rail Shoulder for E Clip Fastening System
  • Cast Iron Rail Shoulder for E Clip Fastening System
  • Cast Iron Rail Shoulder for E Clip Fastening System
Find Similar Products

Basic Info.

Model NO.
rs01
Customized
Customized
Certification
ISO14001, ISO9001
Type
Shoulder
Used in
Pre-Stressed Concrete Ties
Model No.
for Rail Uic54, Uic60, 115re,50kg Rail, 60kg Rail,
Keywords
Rail Shoulder
Transport Package
Carton Box, Plastic Bags, Wooden Cases or as Your
Specification
QT450-10(GGG45)
Trademark
Kingrail Parts
Origin
China
HS Code
8608009000
Production Capacity
5000000PCS/Year

Product Description

Introduction Of Plain Surface Cast Iron 5.6 Grade Rail Shoulder
Plain Surface Cast Iron 5.6 Grade Rail Shoulders are cast in the concrete ties for fixation of Elastic Rail Clips. Our Iron Shoulders are manufactured from pearlitic malleable iron (M. C. I. Inserts) and spheroid graphite iron (S. G. C. I. Inserts). We offer two types of Iron Shoulders: Single Stem Iron Shoulders mostly used in pre-stressed concrete ties, and Twin Stem Iron Shoulders commonly used in Bi-Block or Twin Block concrete ties.
The shoulder accessories are supplied for specific rail sections with design criteria which ensure that the correct elastic clip toe loading is achieved. Certain shoulders are supplied with milled weld area faces to assist in achieving the necessary weld integrity.

Parameter Of Plain Surface Cast Iron 5.6 Grade Rail Shoulder
Name  Plain Oiled / Black Treated Cast Iron Shoulder
Type For rail UIC54, UIC60, 115RE,50kg rail, 60kg rail,BS80lbs, BS100lbs
   Or the type by customers' drawings
Material QT500-7 (GGG50) QT450-10(GGG45) QT400-15(GGG40)
Chemical composition(%) C:3.60-3.80, Mn:≤0.6, Si:2.50-2.90, P:≤0.08, S:≤0.025 C:3.40-3.90, Mn:0.2-0.5, Si:2.70-3.00, ,P:≤0.07, S:≤0.03 C:3.5-3.60, Mn: ≤0.5, Si:3.00-3.20 ,P:≤0.07, S:≤0.02
Surface plain (oiled)

Pictures of Surface Cast Iron 5.6 Grade Rail Shoulder 
Cast Iron Rail Shoulder for E Clip Fastening System

Rail Shoulder has the following advantages:
1. The rail shoulder is designed reasonably, there is no impact during installation, and it is fastened by bolts into one body, and there is no damage or falling off during use, which solves the problem of damage and loss of the pin anti-climbing device. Rail ancho has advanced design, simple structure, easy to install and maintain;
2. Long service life. The anti-climbing effect of the rail anchor is very good, the anti-climbing resistance is large, the anti-climbing is durable, and it is easy to use. It is well received and welcomed by the on-site construction personnel
3. Good anti-climb performance and advanced technology. The anti-climbing is reliable, does not loosen, does not fall off, the effect is long-lasting, the anti-climbing resistance is large, and the anti-climbing effect is good.
4. The use cost is low. Therefore, the maintenance cycle is long, which greatly reduces the maintenance and maintenance costs.
5. Rail anchor can greatly reduce the line diseases caused by line crawling, and at the same time improve the anti-breaking ability, which plays a good role in improving line quality and ensuring safe production.


Installation attention of Rail Shoulder:
When assembling, you should first determine the direction that needs to prevent the rail from crawling, and place the wooden bearing plate, and clamp the main and auxiliary bodies of the rail anchor on the bottom edge of the rail, so that the active surface of the rail shoulder is consistent with the crawling direction of the rail, and then follow the rail Insert the connecting bolt at one end of the anchor body, add a flat washer and a spring ring, and screw the nut so that the active surface of the rail anchor is in close contact with the wooden bearing plate, and finally tighten the bolt with a torque of 150 N m. Tighten the connecting bolts after 2 to 3 weeks of use. It should be noted that it is strictly forbidden to hit the installed rail anchor with a heavy hammer to prevent damage to the rail anchor under high stress.


Our Services
Ruika Railway Company is an ISO certified and Alibaba verified member export railroad fastening products to over 35 countries. We have 4 strategies joint-venture factories. We have a large selection of track accessories and tools to fit your needs: Steel Rail, Rail Clip, Fishplate(Joint Bar), Baseplate, Rubber Pad, Rubber Crossing Plates, Screw Fasteners, Rail Clamps, Rail  Anchors, Turnout, Wagons, Locomotive and Rail Maintenance Machines, etc. 

Our users include railroads construction, mining companies,heavy industries, overhead crane , railroad and tunneling industry, transit authorities, subway, passenger railway and operators of port facilities,etc. 
Cast Iron Rail Shoulder for E Clip Fastening System
Cast Iron Rail Shoulder for E Clip Fastening System

Kingrail Parts railway fasteners including:
Railway sleeper spike, Square head coach screw, Drive spike, Track spike;
TR thread screw spike, Self-tapping screw spike; Timber Sleeper Screw;
Track spike,Double-ear spike,Lock spike,Anchor spike,Track nail,Switch bolts;
Square head fishtail bolts,Cup head oval neck fish bolts,Frog bolt;
Oval neck track bolts,Diamond neck track bolt, Rail clip bolts,T bolt,Clamp bolt.

Cast Iron Rail Shoulder for E Clip Fastening System


FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.

Q: How long is your delivery time?
A: Generally within 25-30 days for a 20ft container after the prepayment received.

Q: What is your terms of payment ?
A: 30% of the payment in advance , the balance before shippment via T/T.

Q: Will that be possible for us to receive pieces of samples for  approval?
A: Sure. The samples can be supplied for free but the freight counts on you.

Q: What's the packing way?
A: Bundled in steel strips with iron/wood pallets.

Q: How long will it be the quotation valid?
A: The validity is 15 days in general, but also depends on the quantity and special conditions. It will be shown in every quotation.

Q: What is MOQ?
A: 20'' container in general, depending on whether enough stocks available for small quantity; customized products accepted.

Q: Do you have any certifications regarding Rail Dog Spikes?
A: We have passed the certification of CRCC in China and ISO9001:2008 overseas. Before shipment, Certificate of Quality can be supplied. We also accept Third Party Inspection from clients, with free samples to supply.


Contact us
If you have any questions, pls feel free to contact us as below:
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier