R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining

Product Details
Customization: Available
After-sales Service: Free After Service
Warranty: 1-3years
Still deciding? Get samples of US$ 10/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (11)
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
  • R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
Find Similar Products

Basic Info.

Model NO.
rR06
Certification
ISO14001, ISO9001
Type
Rail Track
Applications
Lightway, Subway,Train Rail
Transport Package
Packed in Bundle with Iron Wire
Specification
steel, iron, carbon steel
Trademark
Kingrail Parts
Origin
China
HS Code
86080090
Production Capacity
500000/PCS

Product Description

Steel rail is the main component of railway track. Its function is to guide the wheels of rolling stock to move forward, bear the huge pressure of the wheels, and transmit it to the sleepers. The rail must provide a continuous, smooth and least resistance rolling surface for the wheels. In the electrified railway or automatic block section, the rail can also be used as a track circuit.
R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
We can supply the steel rails used for general speed railway track with 160km/h,high speed railway track with 250km/h and 350km/h and profile from 37kg/m-75kg/m according to customers' requirements. At the same time,we can supply switch rail,crane rail,Head Hardened Rail

 R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
The parts used to connect each section of the rail and the rail to the sleeper to form a continuous track are called steel rail accessories. According to the application part, it is divided into joint connecting parts and intermediate connecting parts. In addition, there are rail anchors and rail gauge rods to strengthen the curve, such as rail joint bar, track bolts, etc.

PARAMETER

Name

Specificaton

Materials

Standard of Products

Theory Weight

Length of Dimension (m)

Packed in bundle with iron wire (pcs/bundle)

Light Rail

4kg/m

Q235

Q/YYG001-2008

4kg/m

6,8,9,10

75

8kg/m

Q235

Q/YYG001-2008

8.42kg/m

55

12kg/m

Q235

GB11264-89

12.2kg/m

36

15kg/m

Q235/55Q/50Q

GB11264-89

15.2kg/m

28

18kg/m

Q235/55Q/50Q

YB222-63

18.02kg/m

21

22kg/m

Q235/55Q/50Q

GB11264-89

22.3kg/m

21

24kg/m

Q235/55Q/50Q

Q/YYG001-2008

24.46kg/m

21

30kg/m

Q235/55Q/50Q

GB11264-89

30.1kg/m

15

Heavy Rail

38kg/m

U71Mn/U71/45Mn

GB2585-2007 Q/YYG002-2008

38.733

12,12.5

10

43kg/m

U71Mn/U71/45Mn

GB2585-2007 Q/YYG002-2008

44.653

10

50kg/m

U71Mn/U71/45Mn

GB2585-2007 Q/YYG002-2008

51.514

10

Crane Rail

QU70

U71Mn

YB/T5055-93

52.8kg/m

12,12.5

10

QU80

YB/T5055-93

63.69kg/m

10

QU100

YB/T5055-93

88.96kg/m

5

QU120

YB/T5055-93

118.1kg/m

5



Steel Rails users include railroads construction, mining companies,heavy industries, overhead crane , railroad and tunneling industry, transit authorities, subway, passenger railway and operators of port facilities,etc.
Production Process
The rails produced by Rica are made of carbon-killed steel smelted in open hearth furnaces and oxygen converters. Its purpose is to withstand the working pressure and impact load of rolling stock.
R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
Ruika has high requirements for the quality of steel rails:
1. The rail after Ruika rolling is straight, without significant bending or twisting. The local bending and torsion of light and heavy rails and their corrective deformation, and the inclination of rail end faces are also within the scope of the standard.
2. The surface of the rail produced by Ruika is clean and smooth, free from cracks, scars, scratches and other defects. There are no shrinkage marks and interlayers on the rail end. The degree of defects and geometric quantities allowed on the overall surface of the light and heavy rail. The rails produced by Ruika are all within the scope specified by the standard.
3.The cross-sectional shape of the rail adopts an I-shaped cross-section with the best bending resistance, which is composed of three parts: rail head, rail waist and rail bottom. In order to make the rail better withstand the forces from all aspects, the necessary strength conditions are guaranteed. The rails produced by Rica have sufficient height. The head and bottom of the rails produced by Rica have sufficient area and height, and the waist and bottom are not too thin.

R65 R60 R59 Standard Grade Heavy Type Railway Steel Railing Rail for Mining
Company Introduction
As an ISO 9001 certified company,Ruika has built the intensive quality control networks, established strict rules and inspection standards.We only assigned professional and experienced staffs during the whole procedure as the key resource of the quality control.
As one of the first recommend premium suppliers on Alibaba, Ruika is always committed to providing you with a complete set of railway accessory systems to fit your needs: Steel Rail, Rail Clip, Fishplate(Joint Bar), Baseplate, Rubber Pad, Rubber CrossingPlates, Screw Fasteners, Rail Clamps, Rail Anchors, Turnout, Wagons, Locomotive and Rail Maintenance Machines, etc.

FAQ
Q: Are you trading company or manufacturer ?
A: We are a factory.

Q: How long is your delivery time?
A: Generally within 25-30 days for a 20ft container after the prepayment received.

Q: What is your terms of payment ?
A: 30% of the payment in advance , the balance before shippment via T/T.

Q: Will that be possible for us to receive pieces of samples for approval?
A: Sure. The samples can be supplied for free but the freight counts on you.

Q: What's the packing way?
A: Bundled in steel strips with iron/wood pallets.

Q: How long will it be the quotation valid?
A: The validity is 15 days in general, but also depends on the quantity and special conditions. It will be shown in every
quotation.

Q: What is MOQ?
A: 20'' container in general, depending on whether enough stocks available for small quantity; customized products accepted.

Q: Do you have any certifications regarding rail tie plates?
A: We have passed the certification of CRCC in China and ISO9001:2008 overseas. Before shipment, Certificate of Quality can be supplied. We also accept Third Party Inspection from clients, with free samples to supply.


Contact Us
If you have any questions, pls feel free to contact us as below:

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier